  1. Saipem
Previous
  1. BP,Shell,ConocoPhillips,Unical &Cuulong Vietnam,
  2. Encana Gas,
  3. Cuulang Sutuvang Vietnam
Education
  1. Welding Institute Cambridge UK
224connections

Join LinkedIn & access Trevor's full profile

Join LinkedIn & access Trevor's full profile. It's free!

As a LinkedIn member, you'll join 300 million other professionals who are sharing connections, ideas, and opportunities.

  • See who you know in common
  • Get introduced
  • Contact Trevor directly
224connections
Saipem

Saipem

QA/QC Co-ordinator

– Present

View full profile

Background

Summary

Please Note that The Employment History are approximate dates however the chronology of them are correct.

Experience

QA/QC Co-ordinator

Saipem
– Present (3 years 6 months)Worldwide

Responsabilities for project QC personnel and final documentation during installations and fabrication.
Ensuring full compliance of specifications and procedures within the project specific (ITP) inspection test plans.Trouble shooting and improving company procedures and operational personnel standards.

Asean Regions

BP,Shell,ConocoPhillips,Unical &Cuulong Vietnam
(28 years 1 month)Malaysia,Myanama,Thailand,Indonesia,Philipines,China,Korea & Vietnam

Various Oil and Gas Projects in the Asean region various positions held from Vendor pre project fabrication and documentation,Fab yard construction,Offshore installation and Hook up on stream.
Positions Held Clients Rep,Clients QA/QC Rep, and Supervisory roles as SNR Welding.NDT and engineering inspection

SNR QC Clients Representative

Encana Gas
(1 year 1 month)Nova Scotia Canada

Installation of in field pipelines utilising Real Time Radiography.

SNR QC Clients Rep

Cuulang Sutuvang Vietnam
(2 years 1 month)Batam Indonesia/ Singapore / Vung Tau Vietnam

Fabrication of an eight leg jacket and top side production platform in Batam Indonesia and Vung Tau Vietnam.Followed by installation offshore.

Site Clients QC Representative

British Petroleum
(1 year)Cilegon Inonesia and Papua NG

Organising clients QC control on an EPIC contract in Gunanusa fabrication yard on two wellhead platform fabrications for BP Tungghu project

Clients QC Represenatative

ConocoPhillips (Asia)
(5 years 1 month)Batam Indonesia

Employed as QC representative on pipe fabrication, wellhead fabrications, offshore installation and hook ups.
WNTS Pipelines / Balanak wellhead and FPSO / Belut Jkt/Topside & pipelines (ConocoPhillips)

SNR QC Inspector

OKIOC Aker Rauma Russia
(2 years 1 month)Astrakhan Russia and Kazahkstan Caspian Sea

Fabrication of a shallow water drilling rig for Parker Drilling, initially in a fabrication yard in Astrakahn in Russia then hook up offshore Caspian Sea.

Clients QC Representative

AIOC Baku
(3 years 1 month)Baku Azerbaijan

Chirag early oil project fabrication of topside structures onshore and installation of subsea pipelines.

SNR QC Inspector

Malmac Offshore
(3 years 1 month)Thailand.Malaysia & Indonesia (Offshore installation and hook ups)

Senior QC Inspector involved in subsea pipelays/riser & subsea plem installations, also jacket and topside installations.

Clients QC Platform inspector

British Petroleum
(3 years 1 month)North Sea Magnus,Thistle, Beatrice A & B

Periodic inspection and upgrades on the above oil/gas platforms in conjunction with shore based engineering.

QC clients Representative

Shell Sarawak
(4 years 1 month)West & East Malaysia and South Korea

Shell QC representative onshore and offshore in Jacket and Topside construction, installation and hook up.

SNR Welding and NDT UT crosschecker

Brunei Shell
(1 year 1 month)Brunei

Platform inspections, upgrades and new modifications Shell clients QC

Projects

OFON Phase 2 - Total E&P Nigeria Limited (TEPNG)

The OFON field development is located within the Oil Mining Lease (OML) 102, 45 km of the southeastern coast of the Nigeria in approximately 40 meters water depth. The field, initially brought into production in 1997 is owned by the Joint Venture NNPC/TEPNG and is operated by Total E&P Nigeria Limited (TEPNG).

The key objectives of the Ofon Phase II project are:
To stop gas flaring on Ofon
To deliver gas to Bonny LNG plant via Amenam facilities
To increase production from current 50,000 bopd to about 100,000 bopd
To improve operating conditions by installing living quarters on site, resizing water injection, installing water treatment capacity, and providing gas-lift activation to existing and new wells

Team members:

Williams Gulfstar 1 - Tubular Bells Project Transportation & Installation

The Gulfstar Floating Production Facility (FPS) is comprised of a Classic Spar Hull, with 568 ft overall length x 85 ft diameter x 508 ft draft, with a three level topside structure 6804 mT (7500 short tons), consisting of a main deck with integrated Living Quarters' Package, a production deck, and a cellar deck. The facility also includes a Flare Boom, Pedestal Crane, porches for future export risers, pull tubes for production SCRs from subsea satellite manifolds, I-tubes for ten umbilicals, and a mooring system comprised of nine taut leg mooring lines.

Team members:

WILLIAM'S GULFSTAR FPS PROJECT

Temporary deck removal and installation of new deck on platform.

Team members:

ConocoPhillips Eldfisk 2/7S Wellhead, Process & Accommodation Platform

Installation of 40-slot wellhead, process and accommodation platform. C00 module (9884 t), UQ0 module (6197 t) and West crane house (120 t).

Team members:
  • Trevor Marwood,
  • Giorgio Minneci,
  • Giuseppe Mastellone,
  • Oleksandr Mikhieiev,
  • Carlo Banca,
  • simone canteri,
  • Fucci Guido Emanuele,
  • Francesco Di Pietro,
  • Kristian Peric,
  • Jessica Nunes,
  • Svetlana Nechayeva,
  • Mike Paskin,
  • Scott Ross,
  • Vladimir Voytov,
  • Daguinsin Richard Francisco,
  • Roberto Quintini

SKULD Project - PAU P29 Module

The transportation of the PAU P29 module on a standard North Sea 300ft x 90ft cargo barge from the fabrication yard in Haugesund to a transfer site where it will be lifted onto the deck of the S7000. The S7000 will then transit to the installation site where the S7000 will lift the PAU P29 module onto the Norne FPSO.
The Norne Field is situated 85 km to the North East of the Heidrun field and approximately 200km west of Sandnessjoen. The Norne FPSO is anchored with 12 anchors to a turret around which the FPSO weathervanes in a water depth of around 380m. The module has an NTE weight of 200t and dimensions of 23m x 4.5m x 10.5m.

Team members:

LUNDIN Edvard Grieg Jacket Transportation and Installation(Link)

Edvard Grieg Launch Jacket with a dimension of 134m x 66m x 50m and weight of NTE 15,000t.
18 No. Jacket Piles dimension of 86.6m x Ø 96” and weight of 389t each.

The Edvard Grieg field is planned to be developed with a process and living quarter platform supported on a steel jacket substructure. Drilling of the production and injection wells will be performed by a jack-up rig. Produced rich gas is planned exported via pipeline to the SAGE terminal and stabilised oil via pipeline to Grane. The water depth at platform location is 109m relative to MSL. Saipem have been awarded the Marine Installation contract for jacket and topsides.

Team members:

Talisman Energy UK Ltd. - Montrose BLP Project

Talisman intends to develop both fields as subsea tiebacks to a new Bridge Linked
Platform (BLP) to be installed adjacent to the existing Montrose Alpha platform and this is
collectively described as the Montrose BLP Project. Oil will be exported to FPS via the
existing export riser on Montrose. Gas will be exported to CATS through the existing gas
export pipeline via a new riser on the BLP. Production start-up is anticipated in Q4 2015.
Saipem Ltd has been awarded the Transportation and Installation contract for the
Montrose BLP development by Talisman.
The Montrose BLP development comprises the following new platform components:
BLP Platform - (Jacket, Piles, Topsides, Bridge and Flare)

Saipem will use the SSCV S7000 to perform the heavy-lift work, operating on DP mode.
The installation will be split over 2 years, with the following being installed in 2014:

Montrose Jacket and Piles
Jacket not to exceed Lift Weight of 6000 t

Team members:

Talisman Energy UK Ltd. - Montrose BLP Project

Talisman intends to develop both fields as subsea tiebacks to a new Bridge Linked
Platform (BLP) to be installed adjacent to the existing Montrose Alpha platform and this is
collectively described as the Montrose BLP Project. Oil will be exported to FPS via the
existing export riser on Montrose. Gas will be exported to CATS through the existing gas
export pipeline via a new riser on the BLP. Production start-up is anticipated in Q4 2015.
Saipem Ltd has been awarded the Transportation and Installation contract for the
Montrose BLP development by Talisman.
The Montrose BLP development comprises the following new platform components:
BLP Platform - (Jacket, Piles, Topsides, Bridge and Flare)

Saipem will use the SSCV S7000 to perform the heavy-lift work, operating on DP mode.
The installation will be split over 2 years, with the following being installed in 2014:

Montrose Jacket and Piles
Jacket not to exceed Lift Weight of 6000 t

Team members:

LUNDIN Edvard Grieg Jacket Transportation and Installation(Link)

Edvard Grieg Launch Jacket with a dimension of 134m x 66m x 50m and weight of NTE 15,000t.
18 No. Jacket Piles dimension of 86.6m x Ø 96” and weight of 389t each.

The Edvard Grieg field is planned to be developed with a process and living quarter platform supported on a steel jacket substructure. Drilling of the production and injection wells will be performed by a jack-up rig. Produced rich gas is planned exported via pipeline to the SAGE terminal and stabilised oil via pipeline to Grane. The water depth at platform location is 109m relative to MSL. Saipem have been awarded the Marine Installation contract for jacket and topsides.

Team members:

GDF Exploration Diving & Infield Installation Cygnus

The spoolpieces have been designed by Genesis, and will be fabricated by Isleburn at their
fabrication yard in Invergordon, Scotland. The spoolpieces will be loaded out by the Fabricator on
to a Contractor supplied transport vessel that will take the spoolpiece to the S7000 in Stavanger,
Norway. Where the spoolpieces will be transferred to the S7000 and transported to the Cygnus
field and wet parked in preparation for a DSV to perform the final tie.
The spoolpieces that are to be wet parked by the S7000 have their characteristics summarised in
the below two tables:
The first 7No. spoolpieces are to be wet stored close to the SSIV in the Cygnus field, and the
following 6No. spoolpieces are to be wet stored close to the WYE Manifold.

Team members:

Languages

  1. Basic Bahasa Indonesian

Skills

  • City and Guilds
  • Mechanical Engineering
  • Ordinary National...
  • Marine Engineering
  • Eng Officer (BP)
  • 2.1 Degree Humanities...
  • Engineering
  • Inspection
  • Onshore
  • Pipelines
  • Metal Fabrication
  • Construction
  • Petrochemical
  • Quality Control
  • Petroleum
  • Piping
  • ASME
  • Quality Management
  • Pressure Vessels
  • NDT
  • EPC
  • Oil/Gas
  • Subsea Engineering
  • See 8+  See less

Education

Welding Institute Cambridge UK

CSWIP/PCN, Welding/NDT, CSWIP 3.2 AND PCN Lev II UT & RI , APIRP2X UT , AUTO UT PHASED ARRAY

Constant upgrade of knowledge and technoligical changes within the Oil and Gas business.

Activities and Societies: Registered Senior Welding Inspector Cer No 2145 European Welding Inspector Specialist Cert No EWIS/GB/OI917 International Welding Inspection Diploma Cert No IWI-S/GB/OI917 International Association Of Quality Practitioners Memb No 009327 PCN BiNDT Licensed Engineering Practitioner Reg No 0327

Open University

2.1 Humanities, Politics and Philosophy

Lieth Nautical College Edinburgh

ONC Marine Eng, Marine Engineering Officer British Petroleum, Highest rank achieved 3rd Officer

Activities and Societies: Merchant Navy Officer on Steam Driven Oil Tankers 90.000 tons and above.

Kitson College of Eng & Science Leeds

City and Guilds Mech Eng, Mechanical Engineering, Credit + advanced machine processes Differential milling etc

Activities and Societies: Day release technical college whilst working on a 6 year craft apprenticeship relating to marine pumps.Boiler Feed, Vacuum, Impellar fabricating testing and installation (Sulzer)

Sheepscar County Secondary ( College on the beck)

University of Life masters degree, Survival

Activities and Societies: Survival

View Trevor's full profile to...

  • See who you know in common
  • Get introduced
  • Contact Trevor directly

Not the Trevor Marwood you're looking for? View more

Insights


People Also Viewed

LinkedIn member directory:

  1. a
  2. b
  3. c
  4. d
  5. e
  6. f
  7. g
  8. h
  9. i
  10. j
  11. k
  12. l
  13. m
  14. n
  15. o
  16. p
  17. q
  18. r
  19. s
  20. t
  21. u
  22. v
  23. w
  24. x
  25. y
  26. z
  27. more