Juan Eduardo Quintana

Field Piping Engineer at Petromital Engineering & Construction Services.

Location
Ecuador
Industry
Construction

As a LinkedIn member, you'll join 300 million other professionals who are sharing connections, ideas, and opportunities.

  • See who you and Juan Eduardo Quintana know in common
  • Get introduced to Juan Eduardo Quintana
  • Contact Juan Eduardo Quintana directly

View Juan Eduardo's full profile

Juan Eduardo Quintana's Overview

Current
  • Field Piping Engineer & Piping Subcontractor at PETROMITAL Engineering & Construction Services
Past
  • Projects Engineer at NOVACERO S.A.
Education
  • National Polytechnic School
  • Instituto Superior Central Técnico
Connections

24 connections

Juan Eduardo Quintana's Summary

Thirteen (13) years of working experience in field engineering and construction of piping and mechanical facilities for the Oil, Gas and Power Industry in EPC and EPCM projects locally and overseas.

Juan Eduardo Quintana's Experience

Field Piping Engineer & Piping Subcontractor

PETROMITAL Engineering & Construction Services

March 2013Present (1 year 7 months) Ecuador

Engineering and Construction Services.

Field Piping Engineer & Piping Materials Adm.

Techint Engineer & Construction

Privately Held; 10,001+ employees; Construction industry

20012013 (12 years) Saudi Arabia, Trinidad & Tobago, Bolivia, Perú

Head of Technical Office & Operations and Maintenance Engineer

Techint Engineer & Construction

Privately Held; 10,001+ employees; Construction industry

20012005 (4 years) Ecuador

Production Supervisor

INDUSTRIA ACERO DE LOS ANDES S.A.

20002001 (1 year) Quito, Ecuador

Job Description:

• Planning, control and inspection of cutting and forming process for the production line of Pressure Vessels and Atmospheric Storage Tanks fabricated on shop and pre-manufactured for erection on field.
• Planning, control and inspection of fit up and welding of ASME pressure vessels and storage tanks fabricated on shop with GTAW, SMAW and SAW process.
• Follow up and control of equipment under fabrication process.
• Supervision of heavy equipment transportation from Quito – Ecuador to Santa Cruz de la Sierra – Bolivia.

Main Projects: Fabrication of equipment for Oil & Gas Industry.

Projects Engineer

NOVACERO S.A.

19992000 (1 year) Quito, Ecuador

Job Description:

• Design, construction and installation of a recovery system for electrostatic paint based in the used of tangential inlet cyclones.

Main Projects: Design and Construction of tangential inlet cyclones.

Juan Eduardo Quintana's Projects

  • TECHINT I & C – FENIX POWER PLANT – FENIX & SNC LAVALIN (FEB. 2012 – FEB. 2013)

    • February 2012 to February 2013
    Team Members: Juan Eduardo Quintana

    Job Description:

    • Engineering support for piping installation in Las Salinas, Chilca-Perú.
    • Piping materials administration (spools and field piping materials).
    • Inspection of piping materials.
    • Inspection, coordination and tracking of Hydro test Circuits.

    Project description: The project involve the construction of a 520MW combined cycle power plant that will use natural gas from the Camisea pipeline. The Fénix Thermoelectric Power Plant has two gas turbines and one steam turbine and its facilities are located at km 64 of the Panamericana Sur road, in the populated center of Las Salinas, in Chilca, the energy hub of southern Peru. This electro-mechanical subcontract includes installation of steel structures, piping, BOP equipment, steam turbine and condenser, electrical cables and instruments.

  • TECHINT E & C – EPC 3RD TRAIN SABALO GAS PLANT – PETROBRAS (OCT. 2010 – SEP. 2011)

    • October 2010 to September 2011
    Team Members: Juan Eduardo Quintana

    Job Description:

    • Engineering support for spools pre-manufacturing at Inesco subcontractor’s Pipeshop in Santa Cruz de la Sierra.
    • Piping materials administration (420 Ton of spools and 460 Ton of field piping materials).
    • Elaboration of production orders, for programming of pre-manufacturing workshop activities.
    • Inspection of piping materials and tracking of NCR involved.
    • Control and review of isometric drawings and reporting of pre-manufacturing progress.
    • Requisition of materials for commissioning and startup of mechanical equipment.

    Project description: The contract includes the development of detailed engineering, procurement and construction of processing 3rd Train to expand Sábalo Gas Plant located in the area of Villamontes, Department of Tarija in Bolivia. The scope includes inlet facilities, contaminant removal unit, amine sweetening unit, dew point adjustment unit, condensate stabilization unit, propane refrigeration system, glycol regeneration unit and auxiliary services. The expansion increased by 6.7 MMSCMD current processing capacity totaling 20.1 MMSCMD.

  • ALT ( JV CB&I / TECHINT E & C ) – POINTE A PIERRE REFINERY, GASOLINE OPTIMIZATION PROGRAM, ACID ALKYLATION AND SULPHURIC ACID REGENERATION – PETROTRIN (2008 – SEP. 2010)

    • 2008 to September 2010
    Team Members: Juan Eduardo Quintana

    Job Description:

    • Engineering support for spools pre-manufacturing of Alky and Acid Plant at Damus Pipe shop.
    • Piping materials administration ( 860 Ton of spools and 566 Ton of field piping materials ).
    • Elaboration of production orders, follow up and tracking of spools.
    • Follow up of materials in order to schedule Pipe shop activities.
    • Inspection of Piping Materials.
    • Control and review of Isometric drawings.
    • Progress reports preparation for piping pre-manufacturing, piping installation and hydro testing.
    • Follow up of outstanding items and completion of test packs.
    • Inspection of hydro testing activities.

    Project description: This Contract Package consists of the Engineering, Procurement and Construction for the installation of the Alkylation and Acid Units which comprises:-

    1. 10,000 bpsd C3/C4 Alkylation Unit using the STRATCO Process.
    2. 300 STPD Sulphuric Acid Regeneration Unit using MECS Process.

    The facility will be constructed in the NE area of the Pointe-a-Pierre Refinery on approximately 300,000 sq.ft. of land in the Republic of Trinidad and Tobago.

  • TECHINT E & C – KHURSANIYAH UPSTREAM AND DOWNSTREAM PIPELINES – SAUDI ARAMCO (2006 – 2007)

    • January 2006 to January 2007
    Team Members: Juan Eduardo Quintana

    Job Description:

    • Review of Engineering Documents including Isometric drawings, P&IDs, Piping Supports drawings, Plot Plans, MTO’s, and Hydrostatic Test Diagrams.
    • Follow up of the IK & OOK piping materials in order to schedule Pipe shop activities.
    • Inspection of Piping Materials, including fittings, flanges, pipes, valves, stud bolts and gaskets, etc.
    • Supervision & coordination of all production activities during the piping pre manufacturing process at Pipe shop (960 Ton).
    • Follow up of internal fusion bonded epoxy materials including spools, fittings and pipes.
    • Coordination, sending and tracking of spools and piping field materials, according to construction site requirements.
    • Supervision and coordination of valves hydro testing activities and tracking of rejected and repaired valves.
    • Supervision and coordination of Test Packs preparation for piping and pipelines.
    • Progress weekly reports preparation for piping pre-manufacturing, valves hydro testing and piping hydro testing.
    • Preparation of piping material requisitions.
    • Red Lines preparation of Isometric drawings, P&IDs, Piping Supports drawings, Plot Plans, MTO’s, Hydrostatic Test Diagrams.

    Project description: Khursaniyah Upstream and Downstream Pipeline Project BI-10-8022 & BI-10-8014 contract includes lying of about 484 KM of 16 to 40 inch diameter pipelines, 960 Ton of spools and 1025 Ton of field piping materials in the Kingdom of Saudi Arabia.

  • TECHINT E & C – HARADH AL CRUDE INCREMENT III PROJECT – SAUDI ARAMCO (2005 – 2006)

    • 2005 to 2006
    Team Members: Juan Eduardo Quintana

    Job Description:

    • Engineering support for spools pre-manufacturing of Haradh GOSP 3 plant, GOSP 2 and Hawips Increment (1800 Ton).
    • Elaboration of production orders, follow up and tracking of spools.
    • Control of documentation and piping materials administration.
    • Supervision and coordination of hydrostatic test and reinstatement.
    • Follow up of exception items required for plant start up.

    Project Description: Haradh Al Crude Increment III Project comprises the engineering, procurement and construction of the following Aramco’s plants: HRDH GOSP-3 Gas / Oil Separation Plant. This portion of the facilities constitutes a new 300 MBCD GOSP with Wet Crude Handling (Plant H23) and Gas Gathering (Plant H24). This facility shall have process control system, utilities, control building, SSD fencing, off plot facilities and other support and infrastructure requirements. This facility shall be located in the Haradh area in the Kingdom of Saudi Arabia.

  • TECHINT E & C – OCP PROJECT – OLEODUCTO DE CRUDOS PESADOS ECUADOR S.A. (2001 – 2005)

    • 2001 to 2005
    Team Members: Juan Eduardo Quintana

    Position: Operations and Maintenance Engineer

    Job Description:

    • Supervision of operation and maintenance activities during guaranty period.
    • Supervision of operations during Start up.
    • Exception items clearing.

    Position: Head of Technical Office

    Job Description:

    • Engineering support for spools pre-manufacturing of pumping stations, pressure reduction stations and marine terminal (5000 Ton).
    • Piping materials administration.
    • Data base preparation for follow up and tracking of spools in fabrication and pipes in painting process.
    • Coordination, sending and tracking of spools and piping field materials, according to construction site requirements.
    • Engineering support for hydro test of main line block valves on shop.
    • Engineering support for construction and piping installation at Pressure Reduction Station PRS-1.
    • Control of Technical and Quality Control documents.
    • Red lines preparation.
    • Control and execution of hydrostatic test of piping and API tank, reinstatement and pre-commissioning of Pressure Reduction Station PRS-1.

    Project Description: Crude oil pipeline transportation system of 503 km of Ø 24", 32", 34" and 36" which includes storage facilities for 1.200.000 bbl, 4 pumping stations, two reducing stations, onshore terminal comprising 5 crude storage tanks of 750,000 bbl each, offshore terminal with two mooring buoys of 230,000 and 130,000 DWT and SCADA system.

Juan Eduardo Quintana's Languages

  • English

    (Full professional proficiency)
  • Spanish

    (Native or bilingual proficiency)

Juan Eduardo Quintana's Skills & Expertise

  1. EPC
  2. Construction
  3. Engineering
  4. Project Engineering
  5. AutoCAD
  6. Piping
  7. MS Project
  8. Petrochemical
  9. SAP business management software
  10. Pre-commissioning
  11. Hydrostatic Testing

Juan Eduardo Quintana's Education

National Polytechnic School

Bachelor of Applied Science (B.A.Sc.), Mechanical Engineering

1999

Grade: Mechanical Engineer

Instituto Superior Central Técnico

Contact Juan Eduardo for:

View Juan Eduardo Quintana’s full profile to...

  • See who you and Juan Eduardo Quintana know in common
  • Get introduced to Juan Eduardo Quintana
  • Contact Juan Eduardo Quintana directly

View Juan Eduardo's full profile

Viewers of this profile also viewed...