Systems Engineer at Disney ABC Television Group
Greater Los Angeles Area
Systems Engineer at Disney ABC Television Group
Greater Los Angeles Area
(Public Company; DIS; Entertainment industry)
November 2005 — Present (4 years 1 month)
• Currently working on conceptualizing and designing to build a common point of ingest for tapes and files entering the Burbank Center from non-DATG sources.
• Conceptualized, designed, and managed the install of a new HD/SD ingest and media preparation station for Broadcast Operations in the Network Operations Center (February 2009 - May 2009)
• Conceptualized, designed, and managed the migration of Disney Channel SD, ABC Family SD, Toon Disney SD, and SoapNET SD into the new HD infrastructure (June 2008 - February 2009)
• Conceptualized, designed, and managed the built of Disney Channel HD, ABC Family HD, and Toon Disney HD. (June 2007 - March 2008)
• Drafted the design of new HD QA/QC room to be used for daily QC needs and standards conversion for DATG ( July 2006 - November 2006)
• Drafted the design of the new uplink station for DATG's Earth Station (May 2006 - September 2006)
(Design industry)
June 2005 — September 2005 (4 months)
Assisted the Sr. Electrical Engineer in drafting and designing of the electrical circuit layouts for residential and commercial buildings. Responsibilities included power calculation for HVAC units and drafting of the single line drawings.
(Privately Held; Medical Devices industry)
June 2004 — September 2004 (4 months)
Enhanced Vision is a leading developer of assistive technology for the visually impaired. I interned with the Sr. Electrical Engineer and assisted him in design of some of their products.
(Educational Institution; 10,001 or more employees; Higher Education industry)
January 2001 — December 2002 (2 years )
BS , Electrical Engineering , 2003 — 2005
AS , Computer Information Systems , 2000 — 2002
MS , Engineering Management , 2009
UCLA-AGSA, AESA