Consulting / Contract Engineer at MBO Partners / Schering-Plough
Greater New York City Area
Consulting / Contract Engineer at MBO Partners / Schering-Plough
Greater New York City Area
(Privately Held; Financial Services industry)
January 2009 — Present (11 months)
Consulting / Contract Engineer in Facilities Engineering at Schering-Plough Summit, NJ Site:
• Document Square D lighting control system configurations, build support database and instruct electricians and new co-ops on running Square D Clipsal and Powerlink products
• Design and supervise minor capital projects to support direct customer requests, regulatory agency requirements and energy efficiency such as a compressed air system, utility metering, fire water distribution reconnect, security system upgrade and site-wide automated lighting control and demand limiting
• Support project engineers in coordination and communication of projects with contractors
• Survey buildings to adhere to safety, health and environmental standards
• Retrofit or install lighting control systems including systems from Square D, Lutron, and Encelium
• Utilized Square D Clipsal and Powerlink lighting control products and software to produce a savings of over $120,000 per year between two buildings
• Coordinated installation of filtration and electrostatic based chiller water treatment system
• Participated on Summit Site Energy Team which produced an average annual cost savings of over
$1 million and average annual CO2 savings of 1800 tons beginning in 2008. Team was awarded the Environmental Achievement Award for Excellence in Energy Conservation in April 2009.
(Public Company; SGP; Pharmaceuticals industry)
January 2008 — Present (1 year 11 months)
Consulting / Contract Engineer in Facilities Engineering at Schering-Plough Summit, NJ Site:
• Documented Square D lighting control system configurations, build support database, and instruct electricians and new co-ops on running Square D Clipsal and Powerlink products
• Explored and implemented lighting control opportunities through advanced systems such as Encelium Technologies and Lutron Electronics
• Designed and supervised minor capital projects to support direct customer requests and regulatory agency requirements such as a compressed air system, utility metering, fire water distribution reconnect, security system upgrade, and site-wide automated lighting control and demand limiting
• Supported project engineers in coordination and communication of projects with contractors
• Utilized Square D Clipsal and Powerlink lighting control products and software to produce a savings of over $120,000 per year between two buildings
• Surveyed buildings to adhere to safety, health, and environmental standards
• Coordinated installation of filtration and electrostatic based chiller water treatment system
• Participated on Summit Site Energy Team which produced an average annual cost savings of over
$1 million and average annual CO2 savings of 1800 tons beginning in 2008. Team was awarded the Environmental Achievement Award for Excellence in Energy Conservation in April 2009.
(Public Company; Food & Beverages industry)
May 2007 — August 2007 (4 months)
• Maintained and tested Waste Water Pretreatment Plant, gathered surface water samples during rain events and submitted to testing lab for contamination testing
• Obtained and tested water samples for preventive maintenance of Boilers, York Chiller, and Reverse Osmosis System
• Managed Maintenance Department Purchasing. Researched, submitted, and placed orders
• Submitted monthly environmental reports to local and state regulatory authorities
• Produced drawings of piping systems, tank containment dykes, trenches, lab areas, plant and office projects with Microsoft Visio
(Public Company; LEH; Capital Markets industry)
August 2006 — April 2007 (9 months)
• Monitored network stability and performance through the use of automatically generated alarms and manually submitted trouble tickets
• Communicated and coordinated hardware, software, and circuit diagnostics with carriers and vendors
• Supported off site personnel through power cycling equipment
• Troubleshot network production issues involving Cisco networking hardware and software, direct ring down and leased lines, WAN, LAN, MAN network connectivity, and external client connectivity
• Installed and tested servers, switches, and other network devices in state of the art data centers
Bachelor of Engineering , Mechanical Engineering (Co-op Program) , 2005 — 2010 (expected)