Enginner Telecomunication
Ecuador
Enginner Telecomunication
Ecuador
I am looking forward to the future projection technology in a system composed of advanced computing systems; digital wireless communications equipment and transmission of the company's reputation that would allow me to improve my skills and knowledge to explode all succeed completely. --
Integration
Troubleshooting
Planning
Transmission
Switch
Core
SDH
PDH
DXX
Tellabs
Marconi
OMS
NERA
(Privately Held; Telecommunications industry)
September 2009 — October 2009 (2 months)
Sites surveys make an inspection where they installed new equipment to review and alternating external
power for the quality requirement
A short overview of the activities:
Site Surveys, Link Budgets and Site acquisition
PDH network design
(Privately Held; Telecommunications industry)
July 2008 — July 2009 (1 year 1 month)
As faithful supervisor FL SDH equipment and integration of Marconi LH, and Team Leader
Multiplexers 870
SDH Marconi MDRS 155 expansion n+0 to n+1
PDH Mini- link TN expansion and upgrade
Sweep-tests with site-master Anritsu 820D, BER tests
SOA and SOM configuration
Testing and Troubleshooting
IP Network, OSPF Area, Cross connection
Weekly progress reports to Roll out Manager
Solving installation problems and defects
Configuration of Marconi Long Haul Radios MDRS 155
Engineer O&M Support for Customer the red SDH and PDH, BTS
Acceptance test and handover documentation
Civil works supervision
Technical implementation and integration, with its technical tests, ATP, Site Master management, integration of external alarm, awaiting resolution of installation, Clean Ups of all sites
PDH as supervisor and team integration Mini-link Traffic Node 2 GSM base stations with their test frame, power, Hiter, BSWR Retur Lost Test Channel, Optimization
(Privately Held; Telecommunications industry)
December 2006 — May 2008 (1 year 6 months)
As technical support and implementation projects
Customer Pacifictel S.A. VPJ Contracts 005-VPJ 025 - VPJ 114
Implementation of PDH Radios Mini-link E, and their BER testing and switching, Errors and put into operation 125 links
Implementation and operation NL290x with their respective
Equipment, Alaniz Spectra of ROE, VER, MLA junctions of Space Diversity, Frequency, Power and Resolution of pending and failures installation of 45 links
RED EDA1200 implementation, delivery stations and put into operation on their respective tests and tests
Engineer NOC Analyst and solution Problem report
VIEW Navigation ports, Engineering Module "C"
Commissioning REDBACK smart edge xx
O&M support for customer
Commissioning Marconi SDH Radios LM MDR 155 whit you respective test and ATP
Multiplexers SMA, AXD 155 delivered to their respective switching & cross connection E1
Implementing Multiplexers 1664/1654/870/1240/1260 models delivered to their respective BER tests, crosconection and put into operation
(Telecommunications industry)
August 2000 — November 2006 (6 years 4 months)
Telecommunications Management projects for various company nationwide such as serving nokia, servi-infratel, Ericsson of Ecuador, Huawei of both Radio freq. Radio Bases
In The company we make various Projects
Commissioning and Integration of GSM BTS 2106 v3
Engineer O&M Support for Customer
Test Drive
MUX plan
Engineer Analyst problem on the NOC
Commissioning and Integration Marconi LH MDRS 155 N+0 & N+1
Commissioning and Integration OMS AXD 155 SMA with cross connection E1
Commissioning and Integration Mini-Link-E whit E1 expansions and network capacity upgrades
Installation Equipment Emerson
Commissioning and Integration Nera SDH N290X
Enginner , Telecomunicaciones , 1999 — 2005