Telecommunication Consultant
Malaysia
Telecommunication Consultant
Malaysia
• Knowledge in Telecommunication industry, telecommunication network infrastructure, Fixed Network (NGN), IN, GSM, WCDMA.
• Knowledge in packet switching - NGN, Huawei SoftX3000, UMG8900 ( Media Gateway ), SG7000 ( Signaling Gateway ), TMG8010 ( Trunk Gateway ), MD5500 (Access Gateway ), NE08 & NE40 ( ATM Node Router), IGWB ( Billing Server ) , MRS6000 ( Media Resources Server ), iManager N2000 ( OSS ), IAD, Dialogic Box, Lucent EXCEL 2000 Switch, Unified Communication, IP Centrex, Prepaid & Postpaid services application server.
• Knowledge in circuit switching – ART900, ETACS, GSM, NEAX 61E, AXE10, 5ESS, EWSD
• Knowledge in Access Network – HONET System, Huawei MD5500, MA5000, V5.2 Broadband & Narrowband Access Gateway
• Knowledge in OSS – Huawei iManager UMS N2000, Metrica NPR, TMOS
• Knowledge in Telecommunication protocol - VoIP, H323, H248, MGCP, C7, R2, ISDN, V5.2, SIP, SIGTRAN
• Knowledge in Networking – Computer Network, Internet, Structured cabling, Optic fiber, TCP/IP, LAN, WAN, VPN, ATM, Frame Relay, Microwave, Wireless LAN
• Knowledge in Window 95, 98, NT / 2000 Server, XP, LINUX, UNIX
• Knowledge in database – MS SQL 2000, mySQL, Sybase, dBase
• Knowledge in office automation software - Microsoft Office, Lotus SmartSuite, Lotus Mail Client, Microsoft Project, Microsoft Visio
Planning, Implement, Commissioning and support for Mobile & Fixed Core Network, NGN, include Transmission (SDH), Media Gateway, Access gateway, xDSL, Broadband, IP-DSLAM
(Privately Held; 201-500 employees; Telecommunications industry)
May 2008 — Present (1 year 7 months)
MNP Project
(Telecommunications industry)
October 2007 — April 2008 (7 months)
RESPONSIBILITIES:
Support the Huawei Fixed Network Product
Project Name: Next Genaration Network (NGN)
Client: Time Dot Com, Malaysia
Duration: Oct 2007 – Apr 2008
Role: Hardware Supervisor / Installation Supervisor / Testing / Technical Support Engineer
Team size: 5
Software and Platform: ,Solaris, Sybase, Win2K, MS-SQL Server 2000,, iManager N2000 NMS
Hardware Used: SoftX3000, UMG8900, MRS6000, iManager N2000, NE20E,
(Public Company; 201-500 employees; Telecommunications industry)
August 2006 — September 2007 (1 year 2 months)
Handle Project and O & M for Telecommunication Project In Malaysia.
1.On going IPDSLAM ISAM-FD 7302 & 7330 and AWS 5523 POC with TM.
2.SDH ( Alcatel OMSN ) project with MAXIS, Operation and Maintenance for NMC MAXIS.
Project Name: TM- IPDSLAM
Client: TM via KUB Telecommunication
Duration: April 2007 – On Going
Role: Support KUB to configure new ISAM-FD IPDSLAM with xDSL Service to Prove Of Concept to TM
Team size: 2
Software and Platform: Alcatel 7302 FD-ISAM, 7330 FD-ISAM,5523 AWS, Solaris 10
Hardware Used: SUN server, Acess Network family (Alcatel 7302 FD-ISAM, 7330 FD-ISAM and 5523 AWS)
Project Name: NMS – MAXIS SDH
Client: MAXIS
Duration: August 2006 – April 2007
Role: Support team to configure new transmission NE with specify circuit into the NMS server at MAXIS network,and monitoring system status
Team size: 4
Software and Platform: Alcatel 1354 RM, 1354 BM, 1353 NM, HP UX, NPOS
Hardware Used: HP server, OMSN SDH family (1640,1450,1660 and 1670)
(Privately Held; 51-200 employees; Telecommunications industry)
February 2006 — July 2006 (6 months)
Support Project and Operation Maintenance team for NGN, MSAN, DSLAM and SDH & PDH project
On going SDH (Huawei OSN 1500) and PDH (HONET OLT & ONU) project with Tenaga Nasiona Berhad (TMB), Operation and Maintenance for NGN Time Telekom.
Project Name: SDH&PDH
Client: TNB, Malaysia
Role: Project coordinator and acceptance test supervisor
Team size: 8
Software and Platform: Win2K, MS-SQL Server 2000, iManager T2000 NMS & HONET BAM
Hardware Used: Huawei OSN 1500, HONET OLT & ONU, iManager T2000, Huawei SSU
Test Instrument : Digital Optical Power Meter, Digital Optical Variable Antenuator, SDH PDH Analyzer
•Coordinate and arrange project pre-activities, preparing project documentation prior to project commencement Responsible on project progress and project activities during project implementation
•On-site delivery arrangement
•Open box inspection & Hardware installation supervisory
•System configuration preparation & Self-test & parameter recording
•Acceptance tests Procedure
(Privately Held; 51-200 employees; Telecommunications industry)
May 2004 — December 2005 (1 year 8 months)
RESPONSIBILITIES:
Support the Huawei Fixed Network Product and Services ( part of Huawei Asia Pacific Regional Support Center).
Project Name: Next Genaration Network (NGN)
Client: Telekom Malaysia Berhad, Malaysia
Duration: Aug 2004 – Dec 2005
Role: Hardware Supervisor / Installation Supervisor / Testing / Technical Support Engineer
Team size: 5
Software and Platform: Win2K, MS-SQL Server 2000,, iManager N2000 NMS
Hardware Used: SoftX3000, SG7000, UMG8900, MRS6000, iManager N2000, NE40, NE08
Project Name: Multi Service Access Network (MSAN)
Client: Telekom Malaysia Berhad, Malaysia
Duration: January 2004 to June 2005 (phase 1)
Role: Technical Engineer
Team size: 3
Software and Platform: Win2K, Solaris 8/9, SQL Server 2000, Sybase 12.5, iManager N2000 NMS.
Hardware Used: MD5500, UA5000 (HONET Access Network)
(Privately Held; 11-50 employees; Telecommunications industry)
April 2003 — May 2004 (1 year 2 months)
• Network Management
- Traffic, ASR, Accessibility, Equipment, Quality & System monitoring and update the database
• Configuration, Testing and Implementation
- Cabling & Power Supply implementation
- Switch Equipment Configuration, Router Configuration and LAN switches
- Commission Testing including Quality of service, accessibility ( PRI ISDN ) and connectivity ( SS7 )
• Maintenance Operation
- Link Outage Plan and unplanned, Route changing, Complaints/Trouble Tickets
- Technical assistance
• Planning
- Network Performance, Capacity expansion, Utilization of access and outbound
- Quality of service, Voice and data via IP related technology
• Department Report and Log
- Prepare report and documentation on Link Outage, Utilization, ASR, Minutes/Traffic and Trouble Tickets.
(Public Company; 1001-5000 employees; Telecommunications industry)
August 1996 — April 2002 (5 years 9 months)
Intelligent Network
• NEAX 61E SSP Operation and Maintenance
- Monitor and manage the switch process load, commissioning new E1 and involve in any project implement testing and commissioning new SSP
• Operation System Support
- Install and configure Linux server and integrated with SSP to capture traffic and billing data
• Develop Network Change Request Database and Routing Diagram
Network Analysis
• Design Database for inter-MSC GSM/ETACS circuits advice and routing maintenance
• Prepare work order and follow-up to region for new circuits advice for ETACS and GSM network
Traffic capacity Management
• Monitor, update and opening new number series for ETACS ART900 subscriber
• Monitor and update switch data polling from all switches to Metrica/NPR system
• Design and update graphical presentation on the network performance report, trunk route network configuration as well as SS7 configuration and disseminate weekly for top management
1993 — 1995
management training, new technology, investing, fishing,blog