
EMS Application Engineer at Midwest ISO
Indianapolis, Indiana Area

EMS Application Engineer at Midwest ISO
Indianapolis, Indiana Area
Just a reminder.. currently NOT seeking employment offers. Thanks!
AREVA, Real-Time Operations, Model Testing, AGC, failure analysis and investigations, SCADA, ABB Applications, State Estimator, Power System Modeling, Transmission Operations, Power Systems Security, Energy Management Systems, Ranger, Network Manager Applications, Reliability Analysis, PI-Historian, Access, VBA, UNIX systems, Power Systems Analysis, Power Market Operations, Power Systems Reliability, Power Systems Planning, Relaying, Power Operations and Control, Optimization, Power Engineering
(Non-Profit; Utilities industry)
February 2008 — Present (1 year 6 months)
EMS Engineering - Real-Time Operations
* Analysis and Investigations in Real-Time Operations
* Network Model Testing and Tuning
* EMS Software Release Integration Testing
* Historical Studies of Real-Time GRID
* AGC Applications, Analysis, and Testing
* Developed Tools and Test Scripts
(Public Company; 10,001 or more employees; Utilities industry)
September 2005 — February 2008 (2 years 6 months)
Sr. Analyst IT – BSC IT ED Real Time (September 2005 – February 2008)
• Maintained computer model data for real-time operations
• Managed ratings between operations, engineering, and PJM
• Analyzed failures in power systems security in real-time
• Determined and fixed data discrepancies in network model
• Provided off-hours support to customers
(Public Company; 10,001 or more employees; EXC; Utilities industry)
January 2004 — August 2005 (1 year 8 months)
• Completed GIS maps and Analysis for presentation
• Worked on PowerPoint presentations for upper management
• Worked on ASP web pages
• Worked on business plans and developed business scorecards
• Transformed GIS data using programming skills
(Public Company; 10,001 or more employees; EXC; Utilities industry)
June 2003 — December 2003 (7 months)
• Studied bus voltages and voltmeter violations
• Inspected distribution circuits for reliability issues
• Performed reliability analysis and fusing coordination
• Determined and helped implement additional cost savings in asset management of equipment
(Public Company; 10,001 or more employees; EXC; Utilities industry)
May 2002 — August 2002 (4 months)
• Performed engineering field research and design
• Investigated technical and field problems
• Performed reliability analysis
• Worked on independent and team projects
• Investigated line clearance citations and engineered solutions
(Educational Institution; 501-1000 employees; Higher Education industry)
September 1999 — May 2002 (2 years 9 months)
• Designed and managed web pages for Valparaiso University
• Developed online application and online forms
• Worked independently from home
• Developed pages for multiple departments across VU
(Privately Held; 11-50 employees; Internet industry)
August 1998 — May 2000 (1 year 10 months)
• Helped customers with Internet related problems
• Designed and authored websites
• Local newspapers featured my accomplished work done designing the first Schererville, IN police dept website as a teenager
MECE , Power Engineering , 2004 — 2007
Master of Electrical and Computer Engineering with major in Power Systems Engineering
BSEE , Electrical Engineering , 1999 — 2003
ieee, star trek, power engineering, energy, electricity, engineering, tennis
IEEE
Valedictorian