Ahmad Fahrudin

Current
  • RF Engineer at Wicell Technologies
Past
  • Drive Test Engineer at ADA Cellworks
  • BSS Engineer for Siemens - Indosat Sumatra Area at Formatel Sistem
  • Network Administrator at Channel-11
Education
  • Politeknik Negeri Malang
  • Universitas Brawijaya
Connections
138 connections
Industry
Telecommunications
Websites

Ahmad Fahrudin’s Summary

• RF Engineer
Drive test Engineer tool, GPS, TEMS Investigation Ver. 4, 5, 6,7 and TEMS ver 8.04, GSM, GPRS, WCDMA
Map Basic, MapInfo 8.0, GIMS 7.
GPS, Compass, Flash Mirror. Path Loss Ver. 4.0. Map Source, Global Mapper 7.0, Google Earth, Geo Track Maker.
Quality testing after integration of new sites
Post processing and study of collected data, transform the data in to report format, document the stats and reports. Study and analysis of radio parameters.

• Commissioning Engineer
BTS and Radio Transmission Installation, Test & Commissioning.
Microwave test & commissioning [software activation and alignment (pointing)].
Measure VSWR with Anritsu Site Master, Bird Site Analyzer and Network Analyzer. Measure Gain Antenna/BTS Transmit with Power Meter.
Measure BER with Siemens PCM Tester, Sunlite BerTest.
BTS Troubleshooting and Maintenance.

Ahmad Fahrudin’s Specialties:

Experienced Drive Testing with TEMS Investigation 2G (TEMS 4.1.1, TEMS 5.1.2) and with TEMS Investigation 2G/3G (TEMS 6.1.5, TEMS 7.1.3, TEMS 8.0.4)
Analyze drive test measurement result, identify site problem, reporting.

Lead and scheduling for Drive Test and Site Audit team

Experience using Site Master [Anritsu], Power Meter, BERTest for Installation & Commissioning BTS & Transmission

Experience user of Microsoft Office


Ahmad Fahrudin’s Experience

  • RF Engineer

    Wicell Technologies

    (Telecommunications industry)

    January 2009Present (11 months)

    Research new technology
    Radio Network Planning
    Managing Drive Test Team

  • RF Engineer

    Nexwave Technologies

    (Privately Held; Telecommunications industry)

    February 2008December 2008 (11 months)

    Reporting to RNO Team Leader and Project Manager
    Doing the optimization of RF Radio performances by analyzing drive test data, to determine the cause of problem issues or events and propose solutions. The solution comprises of proposing antenna down tilt, antenna azimuth and changing the parameter, which ultimately improve the KPI network performance
    Arranging and scheduling 2G and 3G drive test team for GSM, EDGE and WCDMA Network,
    Arranging and scheduling Rigger Team for Site Audit and Physical Optimization (Re-orientation Antenna, Re-Tilt Antenna).
    Act as mentor toward the team engineers
    Make Update of site data after audit or optimization.
    Make Single Site Verification Report, and submit to Huawei

  • Drive Test Engineer

    Nexwave Technologies

    (Privately Held; 51-200 employees; Telecommunications industry)

    June 2007January 2008 (8 months)

    Reporting to Optimization Engineer
    Perform Drive Test for New Site Acceptance RO 2006 & RO 2007. Checking Coverage, QoS and GPRS.
    Perform Drive Test & Functional Test for Re-homing, Re-Parenting BSC.
    Perform Drive Test for Troubleshooting, Tilting and others.
    Analyze drive test result.
    Make New Site Acceptance Report

  • Project Coordinator

    Demeta Telnet

    (Privately Held; 51-200 employees; Telecommunications industry)

    August 2006May 2007 (10 months)

    - Preparing Tender/Bid proposals for Radio Network Engineering: Site Survey, Drive Test and Optimization, Installation & Commissioning.
    - Interface with customers in radio network related matters
    - Act as mentor toward the team engineers
    - Project delivery to customers with good quality of service, values & satisfaction
    - Reporting on a timely basis site’s progress

  • Drive Test Engineer

    ADA Cellworks

    (Privately Held; 201-500 employees; Telecommunications industry)

    August 2005July 2006 (1 year )

    Collect measurement data for KPI network of Telkomsel Jabotabek using TEMS 2, TEMS 4
    Do drive test GPRS
    Do drive test for Re-homing, Re-parenting, Cut Over Night
    Plot drive test result with Mapinfo

  • BSS Engineer for Siemens - Indosat Sumatra Area

    Formatel Sistem

    (Privately Held; 11-50 employees; Telecommunications industry)

    June 2004August 2005 (1 year 3 months)

    • Lead BTS & MW Installation Team.
    • Perform Commissioning & Integration BTS & MW and initial Drive test after BTS on service
    • Make coordination with Vendor (SIEMENS) and Customer (Indosat)
    • Reporting on a timely basis the progress of the project and issues to be addressed to ensure meeting of clients’ requirements.
    • Prepared and perform acceptance test.

  • Network Administrator

    Channel-11

    (Privately Held; 51-200 employees; Information Technology and Services industry)

    October 2003May 2004 (8 months)

    • Perform site survey, point coordinate of the site candidate using GPS
    • Install Radio Equipment at client’s area
    • Maintenance all of radio equipment at NOC and client side
    • Install and maintenance Linux server at NOC
    • Design and implement Wireless Network


Ahmad Fahrudin’s Education

  • Politeknik Negeri Malang

    Diploma 3 , Telecommunication Engineering , 20002003

    Graduated with "A" score for Final Project " Building Webmail Server based on Linux" 2003

    Finalist of LKIP "Sains & Teknologi" PIMNAS XV at Unair, Surabaya

    Activities and Societies:
    board of HME - Electro Students Community, Workshop
  • Universitas Brawijaya

    Diploma , Electonics , 20002003

    Board of HME ( Student Organization)

    Activities and Societies:
    Board of HME ( Student Organization)

Additional Information

Ahmad Fahrudin’s Websites:

Ahmad Fahrudin’s Profile in Other Languages:


Public profile powered by: LinkedIn

Create a public profile: Sign In or Join Now

View Ahmad Fahrudin’s full profile:

  • See who you and Ahmad Fahrudin know in common
  • Get introduced to Ahmad Fahrudin
  • Contact Ahmad Fahrudin directly

View Full Profile