RF Engineer
Indonesia
RF Engineer
Indonesia
• RF Engineer
Drive test Engineer tool, GPS, TEMS Investigation Ver. 4, 5, 6,7 and TEMS ver 8.04, GSM, GPRS, WCDMA
Map Basic, MapInfo 8.0, GIMS 7.
GPS, Compass, Flash Mirror. Path Loss Ver. 4.0. Map Source, Global Mapper 7.0, Google Earth, Geo Track Maker.
Quality testing after integration of new sites
Post processing and study of collected data, transform the data in to report format, document the stats and reports. Study and analysis of radio parameters.
• Commissioning Engineer
BTS and Radio Transmission Installation, Test & Commissioning.
Microwave test & commissioning [software activation and alignment (pointing)].
Measure VSWR with Anritsu Site Master, Bird Site Analyzer and Network Analyzer. Measure Gain Antenna/BTS Transmit with Power Meter.
Measure BER with Siemens PCM Tester, Sunlite BerTest.
BTS Troubleshooting and Maintenance.
Experienced Drive Testing with TEMS Investigation 2G (TEMS 4.1.1, TEMS 5.1.2) and with TEMS Investigation 2G/3G (TEMS 6.1.5, TEMS 7.1.3, TEMS 8.0.4)
Analyze drive test measurement result, identify site problem, reporting.
Lead and scheduling for Drive Test and Site Audit team
Experience using Site Master [Anritsu], Power Meter, BERTest for Installation & Commissioning BTS & Transmission
Experience user of Microsoft Office
(Telecommunications industry)
January 2009 — Present (11 months)
Research new technology
Radio Network Planning
Managing Drive Test Team
(Privately Held; Telecommunications industry)
February 2008 — December 2008 (11 months)
Reporting to RNO Team Leader and Project Manager
Doing the optimization of RF Radio performances by analyzing drive test data, to determine the cause of problem issues or events and propose solutions. The solution comprises of proposing antenna down tilt, antenna azimuth and changing the parameter, which ultimately improve the KPI network performance
Arranging and scheduling 2G and 3G drive test team for GSM, EDGE and WCDMA Network,
Arranging and scheduling Rigger Team for Site Audit and Physical Optimization (Re-orientation Antenna, Re-Tilt Antenna).
Act as mentor toward the team engineers
Make Update of site data after audit or optimization.
Make Single Site Verification Report, and submit to Huawei
(Privately Held; 51-200 employees; Telecommunications industry)
June 2007 — January 2008 (8 months)
Reporting to Optimization Engineer
Perform Drive Test for New Site Acceptance RO 2006 & RO 2007. Checking Coverage, QoS and GPRS.
Perform Drive Test & Functional Test for Re-homing, Re-Parenting BSC.
Perform Drive Test for Troubleshooting, Tilting and others.
Analyze drive test result.
Make New Site Acceptance Report
(Privately Held; 51-200 employees; Telecommunications industry)
August 2006 — May 2007 (10 months)
- Preparing Tender/Bid proposals for Radio Network Engineering: Site Survey, Drive Test and Optimization, Installation & Commissioning.
- Interface with customers in radio network related matters
- Act as mentor toward the team engineers
- Project delivery to customers with good quality of service, values & satisfaction
- Reporting on a timely basis site’s progress
(Privately Held; 201-500 employees; Telecommunications industry)
August 2005 — July 2006 (1 year )
Collect measurement data for KPI network of Telkomsel Jabotabek using TEMS 2, TEMS 4
Do drive test GPRS
Do drive test for Re-homing, Re-parenting, Cut Over Night
Plot drive test result with Mapinfo
(Privately Held; 11-50 employees; Telecommunications industry)
June 2004 — August 2005 (1 year 3 months)
• Lead BTS & MW Installation Team.
• Perform Commissioning & Integration BTS & MW and initial Drive test after BTS on service
• Make coordination with Vendor (SIEMENS) and Customer (Indosat)
• Reporting on a timely basis the progress of the project and issues to be addressed to ensure meeting of clients’ requirements.
• Prepared and perform acceptance test.
(Privately Held; 51-200 employees; Information Technology and Services industry)
October 2003 — May 2004 (8 months)
• Perform site survey, point coordinate of the site candidate using GPS
• Install Radio Equipment at client’s area
• Maintenance all of radio equipment at NOC and client side
• Install and maintenance Linux server at NOC
• Design and implement Wireless Network
Diploma 3 , Telecommunication Engineering , 2000 — 2003
Graduated with "A" score for Final Project " Building Webmail Server based on Linux" 2003
Finalist of LKIP "Sains & Teknologi" PIMNAS XV at Unair, Surabaya
Diploma , Electonics , 2000 — 2003
Board of HME ( Student Organization)